Schedule: Aug 2019 to Aug 2020. General Contractor: Swinerton Project Details and Challenges: The project scope included tenant improvements on occupied suites […]
Schedule: Aug 2019 to Aug 2020. General Contractor: Swinerton Project Details and Challenges: The project scope included tenant improvements on occupied suites […]
Challenges: In 2019, Integrated Systems Group completed a project that showcased all of their strengths by assisting in the design and build […]
Legacy Voice Paging System Overviews Legacy Meridian Park Challenges: The challenges faced at MPMC were basic- the existing legacy paging system was […]
Design/Build Legacy Unity for Behavioral Health In 2016, Integrated Systems Group completed a project that showcased all of their strengths by assisting […]